construction progress
We would be happy to keep you up to date. If you provide your email address, we will send you regular construction updates.
March 2022
The final touches to the outdoor facilities and the clean-up work will be completed shortly. This completes the Lehnstrasse residential complex and will be ready for handover to the owners in the coming days.
December 2021
The scaffolding on both buildings has now been removed and the project is showing its winter splendor. Outside, the landscaping is still in progress, while inside, final assembly and commissioning of the apartments are taking place.
November 2021
The curtain has fallen on the first apartment building and the facade is shining for the first time in the autumn sun. Outside, the landscaping is now beginning, while inside, final assembly and commissioning of the apartments are taking place.
October 2021
Work on the white plaster surfaces on the ceilings, ceiling plaster and ceramic tiles on the walls is being diligently completed in the apartments. The painting work will now follow inside.
October 2021
With the completion of the white plaster ceilings, the apartments are gaining more and more character. Now everything is prepared for the final ceiling coverings on walls and ceilings.
September 2021
While the roofs are being covered with tiles, work is progressing briskly inside the buildings on plastering the walls and ceilings.
July 2021
It is done - the shell is up and the wooden roof is erected. The windows have already been installed and the interior work is now underway.
June 2021
Slowly but surely, the shell is taking shape everywhere. Work is proceeding vigorously to complete the two buildings by the end of June 2021. At the same time, the first sealing work is already being carried out on the outside, while the installation of the building technology has begun inside the building.
May 2021
In a first phase, the finished floor has already been partially installed in the parking garage. At the same time, work continues on the two apartment buildings above the underground parking garage.
May 2021
The two apartment buildings are steadily progressing. While the entrance to the underground garage was being concreted at the same time on Lehnstrasse and the development work is in progress, the apartments in the shell can be seen in the foreground.
April 2021
The construction of the two apartment buildings is in full swing. In the foreground, the last ceiling above the underground garage will be concreted shortly, with the entrance already visible. In the background, an apartment building is already growing in height - the ceiling above the ground floor is already being built.
End of March 2021
The structural work is progressing according to plan. Full commitment from all trades involved so that our buyers can move in on schedule.
January 2021
In the meantime, the construction site was heavily snowed in, so that work could not be resumed until February.
November 2020
The pumping shafts for sewage and rainwater have been relocated and the pump pressure lines have been laid.
October 2020
The excavation pit safety measures have been fully installed all around. The surfaces were pre-reinforced with reinforced concrete and covered with concrete using the spraying process.
To display the map from Google Maps, the script must be allowed to load.
-
5 minutes by bike to the Migros, Aldi, Coop, Lidl and Spar supermarkets
-
2 minutes on foot to the Rickenweg and Hinterbergstrasse bus stops, 6 minutes to the Bruggen train station
-
7 minutes to the A1 motorway entrance, approx. 15 minutes to St. Gallen city center
-
Kindergartens/primary schools within a 1.5 km radius, university & FHS 20-30 minutes by bus/train