Dornbirn
Haferweg

Bis zu 11.500 € sparen – Entfall von Nebengebühren + Wohnbauförderung möglich
Purchase price payment upon handover of the apartment
Planned completion at the end of 2026

The residential project on Haferweg in Dornbirn presents itself as an ensemble of three clearly structured buildings in a neighborhood characterized by single-family homes. Each of the three-story residential buildings has a variety of floor plans and thus individual living spaces for every situation in life. In the 25 units, living comfort is brought to the point. Floor-to-ceiling windows provide plenty of light in the living rooms, and the covered terraces and balconies offer the possibility of cozy hours outdoors. Here you can fully enjoy the peaceful surroundings.

Green spaces and seating areas between the buildings enhance the overall appearance of the residential complex. Visitor parking spaces and covered bicycle parking spaces allow for relaxed coming and going. With the shared underground car park, a lift in every residential building and separate cellar compartments, you can live here without any worries.

Choose
your dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

house
A B C
Floors
Ground 1st Top
Number of rooms
2 3 4 5
living space
40 m² 130 m²
Price
310000 1120000
TOP (13) house Rooms floor living space WBF Price Save
C06 House: C 3 1st 65.6 m² Residential construction funding 469000
C02 House: C 3 Ground 65.6 m² Residential construction funding 469000
B05 House: B 3 1st 62.42 m² 474000
B04 House: B 2 1st 49.13 m² Residential construction funding 375000
B01 House: B 4 Ground 99.51 m² Residential construction funding 739000
A10 House: A 3 Top 62.42 m² 469000
A08 House: A 3 Top 65.74 m² 509000
A07 House: A 2 Top 46.81 m² Residential construction funding 359000
A06 House: A 3 1st 62.42 m² Residential construction funding 464000
A05 House: A 2 1st 49.13 m² Residential construction funding 364000
A04 House: A 3 1st 65.74 m² Residential construction funding 499000
A03 House: A 2 1st 46.81 m² Residential construction funding 349000
A02 House: A 4 Ground 100.37 m² Residential construction funding 739000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

Where quality of life
is at home


The location in the quiet neighborhood on Haferweg offers all the advantages you could want from a cozy home. There are numerous cycling and walking paths towards Ried to discover practically right on your doorstep. Everything you need for a comfortable daily life is also in the immediate vicinity. A bus stop directly in front of the door will take you to the nearby Messepark, for example. All purchases can also be made quickly by bike from your new home. Kindergartens and schools are also within easy reach. The Hermann-Gmeiner-Park offers another leisure activity just a 5-minute walk from Haferweg. The residential area thus offers a high quality of life for young and old.

To display the map from Google Maps, the script must be allowed to load.
  • Short distances to Messepark, local suppliers within walking distance
  • Erlgrund bus stop in front of the door, 3 minutes by bike to Hatlerdorf train station
  • Hermann-Gmeiner-Park around the corner, walking and cycling paths towards Ried in front of the door
  • Kindergarten in the immediate vicinity, schools within easy walking distance

Facilities


ZIMA basic features – high-quality, clear design

Bathrooms and toilet facilities are furnished with modern, high-quality bathroom and sanitary fittings from renowned manufacturers. Simple, elegant design is combined with high-quality materials such as glass, metal, and porcelain stoneware.

The ZIMA basic features focus on a clear design language and first-class workmanship. With elegant wooden parquet flooring, a lively and warm living atmosphere is created, which gives your living spaces a special touch. Proven laying methods and the high quality of the raw material are just as much in focus as consistent sound insulation and a harmonious overall concept in your home.

Smart Home & digital building management as well as a digital locking system complement the equipment package with modern technologies that raise comfort, security and efficiency to a new level.

CONSTRUCTION PROGRESS

We will be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

February 2026

Baukran 1 wurde abgebaut. Am Dach des Rampengebäudes finden Abdichtungsarbeiten statt. Bei Haus A wird das Notdach geflämmt, die Ausschalarbeiten sind abgeschlossen. Bei Haus B wird ebenfalls das Notdach geflämmt und Ausschalarbeiten finden statt. Bei Haus C läuft der Fenstereinbau, die Trockenbauplatten sind eingelagert, die Haustür montiert.
January 2026

Construction work on the new Haferweg project is proceeding according to plan. In building A, formwork is being installed on the top floor. In building B, the stairs are being moved and formwork is also being installed on the top floor. In building C, the top floor, including the elevator shaft, is being concreted and the plumbers are carrying out sealing work – the shell of the building is now complete.
January 2026

With the start of the new year, the walls of House A are being top and formwork is being removed at House top . At House C, the iron reinforcement for the top is being tied.
December 2025

The ceiling above the upper floor and the first walls of House A have been concreted. The ceiling above the upper floor of House B has been concreted. And the walls of the attic of House C have been completed.
December 2025

The walls of the upper floor of House A are being concreted, and the ceiling above the ground of House B has ground been concreted. The ceiling above the upper floor of House C is being formed.
November 2025

At House A, the insertion and iron binding work for the ceiling above the ground is ground . At House B, the formwork for the ceiling above the ground is being carried out, ground at House C, the walls of the upper floor are being concreted.
November 2025

The walls of ground of House A are being ground and bricked. The walls of ground of House B are ground being concreted. Work is underway on the ceiling above the ground of House C.
October 2025

The ceiling of the basement has been completed in buildings A and B, as has the ramp building. The walls of ground are already in place in building C.
October 2025

The sheet piling is currently being installed and backfilling work is taking place.
September 2025

The final basement ceiling is currently being concreted and backfilling work is taking place.
September 2025

The ramp driveway is currently being concreted and formwork work is being carried out on the basement ceiling at House B. At the same time, concreting work is being carried out on the basement ceiling at House C.
August 2025

The basement walls and the basement ceiling in Haferweg are currently being concreted.
July 2025

The fourth and final part of the base plate has been concreted. Walls are currently being concreted and the cellar ceiling is being shuttered.
July 2025

The second construction crane has already been erected, part two of four floor slabs has been concreted and the first basement walls have already been concreted.
June 2025

The first section of the floor slab has been concreted.
June 2025

The pilot work has been completed and the construction crane has been erected. Excavation for the foundations is in progress.
May 2025

Excavation and pilot work are currently taking place.
May 2025

Excavation work and the installation of the sheet piling equipment are currently underway.
March 2025

The sheet piling work has been completed and the groundwater lowering will start today, Friday, 07.03.
February 2025

The demolition work on the existing building on Haferweg is nearing completion and the preparatory work by the builder is underway.